How Do You Install A Cedar Shingle Roof

Installing cedar shingles on the wall isn t a difficult process.
How do you install a cedar shingle roof. You ll also need to install drip edges along the tops of windows and doorways. Separate shingles approximately 6mm apart. Use two 31mm x 1 8mm silicon bronze nails per shingle. Before installing the shakes the roofer covers the roof deck with 15 or 30 pound roofing felt.
A good rule of thumb is getting 10 percent more than you need just in case you need more material. Place special v shaped cedar shingles on the ridgeline at the top of the roof. As with the roof measure the area of each surface making sure to remove square footage for any windows or doors. Lap rows of 36 inch wide felt using the provided lap lines as guides.
Install them after the other shingles are installed on the rest of the shed roof. Four 45mm x 2 65mm silicon bronze nails for hip and ridge capping. Use a tin snips to cut the drip edge to size. It is best to use timber roofing battens and counter battens with a membrane to allow adequate air flow if necessary.
Check the felt paper. Installing cedar roofing shingles yourself can be done when you prepare for all the steps ahead of time. Cost can add up quickly especially if you re a novice and have never attempted a cedar shingle roof installation before. You might be tempted to install your new cedar roofing as soon as you receive it but you need to make sure the wood has enough time to be exposed to your home s climate before you start.
I would strongly recommend you hire a licensed and insured roofing contractor to perform the installation for you. Check the rest of the roof installation to ensure the cedar shakes or shingles laid on the roof up to the ridge are properly installed in straight rows. Install the drip edge on the gable ends of the roof after you finish installing your underlayment. Begin by calculating the number of shingles you ll need.
Trim any thin edges sticking past the roof. Before installing any cedar shingles the first step is to wrap the house in a waterproof membrane or housewrap as well as covering windowsills with a flex wrap to ensure they are waterproof. Place the shakes or shingles under cover and off the ground outdoors. The wood might expand or contract depending on temperature and moisture levels.
Start at the bottom side of the gable and overlap the sections of drip edge a few inches as you work your way up the roof see figure a.