How Do Shingle The Peak My Roof

It generally takes three bundles of shingles to cover 100 square feet.
How do shingle the peak my roof. Many pros shingle in a vertical line up the roof because it s much faster. Put in one 2 inch long nail back 6 inches from the edge of the cap shingle. Overlap the shingles to cover the nails on the. The next one goes on the low side.
If the gap allows you to put another course of shingles then do it. If you need to replace some of the caps here s how to do it. Weave and cut the valley on the highest side of the roof. Butt the edge of the first cap shingle along this line.
Lay the last ridge cap shingle in the center of the shed roof on top of the exposed adhesive portions of the two center ridge cap shingles. How to cap an asphalt shingled roof preparing the peak. Get the right number of shingles for the job. Known in the trade as vertical racking or staggering this how to lay shingles method enables the roofer to install a single column of shingles all the way to the peak without the wasted back and forth motion necessary to fill several rows of stair steps.
Capping a roof is the last thing done during a roofing project. If there is only a little space left then you re fine and don t have to lay another row yet. Nailing the cap. The cap must be positioned to minimize wind and weather damage after it has been nailed down.
You want to lay the shingles from the bottom to the top of the valley. Secure the last ridge cap shingle with four nails at the corners of the shingle and cover the nail heads with roofing cement. This will help determine how the shingles will lay on the. Measure down 6 inches from the center of the roof ridge and chalk a line parallel with the ridge.
Positioning of the cap. Remove old shingles and. The shingles at the peak of your roof are commonly called cap shingles. Preparing the roof 1.
Hammer a roofing nail on each side of the shingle five inches from the bottom edges and one inch from the side edge. Start by overlapping a starter from both sides of the valley at the bottom. Cut and bend a shingle to conform to the shape of the peak of the roof. Measure the length of a shingle as it lies across the roof.
It must be completed at the very end. If your shingles are standard three tab shingles the caps are made by cutting one shingle into three separate parts. This project guide is a combination of those two articles and it covers replacing the existing roof decking installing underlayment and ice dam protection laying the first row laying shingles in the field flashing ridge shingles and vents and more. Ideally the top edge of the last shingle row is flush with the top edge.